Woodberry’s Secret Sewage-spewing Pipe Was Leaking Again for the Last Week, Sending 20,000 Gallons into the Jones Falls

10/25/18

By Ethan McLeod, Baltimore Fishbowl

A troublesome private sewer line in Woodberry has once again leaked tens of thousands of gallons of human waste into the Jones Falls, after a temporary fix installed by the city a year ago stopped working for the last week.

The leak, announced in October 2017 by the Department of Public Works to have been happening inside a secret pipe within a much larger city storm drain, had been stopped for the better part of the last 12 months, after city crews installed a pump to bypass the sewage into a city sewer line nearby. But the pump stopped working on Oct. 17.

And over the last seven days, it leaked out two gallons of sewage per minute, or roughly 20,000 gallons in all, before crews fixed the pump.

READ FULL ARTICLE HERE

Recent Deals

Interested in advertising your deals? Contact Edwin Warfield.

Connect with these Baltimore Professionals on LinkedIn

  • Edwin Warfield

    Editor in Chief, Warfield Digital

    Connect
  • Jean Halle

    Independent Consultant

    Connect
  • Larry Lichtenauer

    President of Lawrence Howard & Associates

    Connect
  • Newt Fowler

    Partner at Womble Carlyle, LLP

    Connect
  • David Crowley

    Owner at Develop DC

    Connect
  • Carolyn Stinson

    Stinson Marketing Group

    Connect