The Druid Lake Construction Mess – It Didn’t Have To Be This Way

10/4/18

By Mark Reutter, BaltimoreBrew

In 2009, the Sheila Dixon administration believed that it had found a way to keep historic Druid Lake intact while satisfying the Environmental Protection Agency’s new regulation to improve water quality nationwide.

The regulation, known as the Long Term 2 Enhanced Surface Water Treatment Rule or LT2, required reservoirs holding “finished,” or treated, water either to be enclosed with a roof or to install advanced chemical treatments before the water is discharged to homes and businesses.

For its small storage reservoirs at Guilford (near Loyola University) and East Towson (off Hillen Road), Baltimore’s Public Works Department opted to build covers over the facilities.

READ FULL ARTICLE HERE

Recent Deals

Interested in advertising your deals? Contact Edwin Warfield.

Connect with these Baltimore Professionals on LinkedIn

  • Edwin Warfield

    Editor in Chief, Warfield Digital

    Connect
  • Jean Halle

    Independent Consultant

    Connect
  • Larry Lichtenauer

    President of Lawrence Howard & Associates

    Connect
  • Newt Fowler

    Partner at Womble Carlyle, LLP

    Connect
  • David Crowley

    Owner at Develop DC

    Connect
  • Carolyn Stinson

    Stinson Marketing Group

    Connect