Ravens Plan $45 Million Expansion of Owings Mills Practice Facility

1/11/17

By Ethan McLeod, Baltimore Fishbowl

The Baltimore Ravens’ players and coaching staff have a lot of work to do heading into the 2017 season. The franchise as a whole also has big plans, much of it involving construction and logistics for the expansion of their practice facility in Owings Mills.

The current space is by no means shabby. In fact, the 200,000-square-foot Under Armour Performance Center is among the best in the league, according to Ravens.com. However, their staff has grown significantly since they opened the facility in 2004 — as shown by a nearly twofold increase in the number of full-time employees — and they want need space to house all of their players during training camp.

The franchise is thus planning an 18-month, $45 million renovation of the castle-like facility. Architecture firm Gaudreau, Inc., developer Whiting-Turner Contracting Company and design consultant Kristin Powers are collaborating on the project.

READ FULL ARTICLE HERE